Home

Saturday, November 29, 2014

Studio: Day 2 of Site Preparation

Tom continued scraping the grass and top soil off the back yard lawn, which is the first stage of the Back Yard Project.

Tom is amazing at being able to see levels while sitting up high in his machine.
He leveled the ground to make a safe access route to the construction site for all of the delivery tracks and the different tradesmen.


A truck brought multiple loads of gravel and dumped it on the new road.


Tom spread the gravel out evenly.

Then Tom compacted the gravel with the head of the bucket attachment.
The old track can now support the construction traffic without getting stuck when it rains.
It will be very efficient for all supplies and vehicles to be able to park right beside the construction site.



No comments: