Home

Friday, June 5, 2015

Studio Construction: Meanwhile Back at the Studio

Dave has started framing up for the outside stair footings.

He said it was lucky he didn't make the framing any smaller because he woudn't have been able to fit inside.

I try out what it is like to have power in the studio.

The tapers are back adding another layer of mud and sanding it back.

Tapers' tool belts hold their own specialised tools.

And they wear stilts. I have been looking out the window on and off all day hoping to catch either Cameron or Jordon wearing their stilts.

Light fixtures have been installed in the crawlspace. Code requires the fixtures dangle and not be fixed to the ceiling. This is so the bulb will move and not break if accidentally walked into.

No comments: