The roofers arrived to put the final layer of bitumen on the shed area roof.
This layer has a rough grit stuck to the surface to make it more weather resistant.
Roofing or clout nails with a big flat, umbrella head.
The roofer hammers with a 2 stroke rhythm to drive the nail home.
In the meantime, Josh is working on the Propagation Room roof.
He is slipping in place each section of 3 boards. The boards are held up out of any rain water by plastic wood blocks that won't rot. We will be able to lift out the panels to clean the debris off the roof. The black part of the roof is sloped towards a drain hole.
No comments:
Post a Comment